The price of a slab foundation is determined by several factors related to the size, specifics of the project, and the materials used. The main components that affect the price are as follows:

  1. Size and volume – a larger foundation will require more materials and work time, which increases costs.

  2. Site preparation – if the ground surface is uneven or additional excavation and leveling work is required, this will increase the price.

  3. Materials – depending on the materials chosen (concrete, reinforcement, thermal insulation, etc.), costs may vary.

  4. Complexity of the work – if the project requires special solutions, such as strengthening the foundation or adapting to complex geological conditions, the price can increase significantly.

  5. Transportation and labor costs – local resources, labor, and logistics can also affect the final price.

In general, the price of a slab foundation depends on the characteristics of the construction site, the project specifications, and the choice of materials used.

blog-image-0061.jpg

Working without materials

We can provide a materials list and you provide the necessary materials.
Labor costs ~35-45 eur/m2

Kanalizācija.jpg

Working with materials (partially)

Includes everything after the land preparation work to achieve a fully completed foundation.

Additional costs to consider: sand, gravel, soil costs + transport + tractor services
Price ~130eur/m2

b27dd117-5a05-4881-96ee-34c649bf12c5.jpg

Full service - Labor + materials

Full cycle service up to finished foundations. Work + materials
Price ~155eur/m2

images.jpg

Materials

Price of materials for creating a Swedish slab ~90-105eur/m2

Payment procedure

Our mutual payment procedures are transparent, well-understood, and easy to understand. So that there are no cases: "We paid the builders, they didn't come and did nothing."

1. We conclude a contract for the agreed work.

2. Stage 1 - We carry out earthworks - we issue an invoice for the work performed.

3. Stage 2 - We deliver materials to the site - we issue an invoice for the delivered materials.

4. Stage 3 - We install the delivered materials up to the concrete - we issue an invoice.

5. Stage 4 - We issue an invoice for the concrete - We pour the concrete, we polish it.

6. Stage 5 - We sign the PN acts. We thank each other for their cooperation.